THE COMPANY

Marq, Integrating Sustainability into Modern Logistics

Marq Logistics is a global leader in the development and operation of modern logistics facilities. The company manages an international portfolio of approximately 2,000 properties, representing more than 600 million square feet of logistics space, and provides high-quality facilities for some of the world’s leading distribution and supply chain businesses. 

​

Sustainability is central to Marq Logistics’ approach to property development and asset management. As its customers and tenants face increasing energy requirements from automation, electric vehicle fleets and the electrification of heating, Marq Logistics is investing in on-site renewable energy solutions that provide cleaner, more reliable and cost-effective electricity.

​

To advance this strategy across its portfolio, Marq Logistics partnered with Greenvolt Next to deliver rooftop solar photovoltaic systems at two major UK logistics facilities occupied by DHL and Bleckmann. 

​

The partnership is helping Marq Logistics transform large, previously unused warehouse rooftops into renewable energy assets, supporting its customers’ sustainability objectives while improving the long-term energy performance of its properties. 

Greenvolt Next - Clients - Marq

Greenvolt Next - Clients - Marq

Marq Logistics blue logo on a black background

THE PROJECT

Rooftop Solar Systems for DHL and Bleckmann Logistic Facilities

Greenvolt Next UK delivered two rooftop solar installations across Marq Logistics facilities in Milton Keynes and Magna Park Lutterworth. 

​

At Milton Keynes, Greenvolt Next installed a 1.2 MW rooftop solar system comprising approximately 2,500 photovoltaic panels. The renewable electricity generated by the installation is used directly by DHL to support its day-to-day operations. 

Aerial view of solar panels on a DHL warehouse roof.
Bleckmann logistics warehouse with DPD truck at a loading dock

At Magna Park Lutterworth in Leicestershire, Greenvolt Next installed a 589 kWp rooftop solar system at a major distribution centre leased by Bleckmann, an international logistics specialist serving the fashion and lifestyle sectors. 

​

The Bleckmann installation comprises 1,310 photovoltaic panels and has the potential to generate approximately 518 MWh of renewable electricity each year, avoiding an estimated 235 tonnes of CO₂ emissions annually. The facility has also achieved BREEAM Excellent accreditation and an EPC A+ energy rating. 

​

Together, the projects represent approximately 1.8 MW of installed rooftop solar capacity across Marq Logistics’ UK portfolio. 

Key numbers that
speak for themselves

Icon of a factory with leaves growing from it

2

UK Logistics facilities

thunder-icon_

~1.8MW

Combined installed capacity

Green and purple gradient icon of a solar panel panel.

3,813

solar panels installed

225 tons

Icon of a hand cradling the globe in a gradient outline.

CO2 avoided annually by the Bleckmann system

Marq lightning bolt icon in a circular arrow

1.15MWp

Installed for DHL in Milton Keynes

Marq lightning bolt icon with circular arrow

584.67kWp

Installed for Bleckmann at Magna Park Lutterworth

Green and blue gradient lightning bolt icon for Marq.

495.769MWh

Estimated annual generation from the Bleckmann system

Aerial view of Marq large scale warehouse and logistics facility

THE CHALLENGE, THE SOLUTIONS AND KEY RESULTS

Scaling Rooftop Solar Across Major Logistics Facilities

Large logistics and distribution centres consume significant amounts of electricity to power lighting, warehouse systems, automation, heating and transport operations. 

The challenge was to introduce large-scale renewable energy generation across two active logistics facilities while ensuring that daily operations could continue without disruption. 

Four men in a business meeting at Bleckmann office.
Engineers in safety vests discussing Marq industrial equipment

Key considerations included: 

Large and complex rooftop areas – each system had to be carefully designed around the structure, layout and operational requirements of the individual building.

​

Business continuity – installation work needed to be completed safely without interrupting DHL’s or Bleckmann’s logistics and distribution activities. 

​

Different customer energy requirements – each system had to be designed to meet the specific electricity demand and operational profile of the building’s occupier. 

​

Long-term asset performance – the installations needed to deliver reliable renewable electricity while complementing the high sustainability standards of the Marq Logistics facilities. 

​

Multi-stakeholder coordination – Greenvolt Next worked closely with Marq Logistics, the occupiers and the wider project teams to manage installation, commissioning and operational requirements. 

Aerial view of the Marq warehouse facility

THE PARTNERSHIP

The Bleckmann installation was officially inaugurated on 28 May 2026, with representatives from Greenvolt Next, Marq Logistics and Bleckmann joined by Alberto Costa, Member of Parliament for South Leicestershire. 

Team in safety gear at a Marq facility
Professional headshot of a man with glasses for Marq.

”The renewable energy projects support the tenant in two folds – first they achieve savings in power prices which is a very hot topic especially recently; and second, they achieve their sustainability goals.

 

Manuel Gallio

Vice President of Renewable Asset Management, ARES

Portrait of Marq in a suit and blue tie

”The real providers are (…) companies like Greenvolt, that are involved in offering clients the necessary energy generation power plant equipment, in this case in the form of photovoltaic solar panels.

​

Alberto Costa

Member of Parliament UK

Headshot of a bald man with a red beard wearing a suit at Marq

”Rooftop solar helps distribution centres generate energy on-site, reduce exposure to volatile prices and cut emissions without disrupting operations.

​

Owen Power

CEO of Greenvolt Next Ireland and UK

Solar panels on a city rooftop at sunset

We bring energy to companies so that projects like these can be born

Discover what we can do for your business

Tell us about your business needs and our experts will prepare the right solution for your company.

Greenvolt Next logo

Greenvolt Next UK
Unit 7 Warrington 
WA28LT

Opening Hours

​

Monday – Friday 8:30 am – 5:00 pm 
Saturday Closed
Sunday Closed
Bank Holidays Closed 

Follow Us​​

​

bottom of page